Category Archives: Finished Projects
Installation Flow “Synergon Petroleum” Ltd.
In relation to Regulation № 3/19.02.2010 of the Minister of Finance of the warehouse for liquefied petroleum gas of “Synergon Petroleum” Ltd, district “Kremikovci” were installed and introduction into service flowmeters “Endress + Hauser”, which made “Sinergon Petroleum” JSC the first company in Bulgaria fulfilled the legal requirements.
Gasification of the production base of “LB Bulgaricum” JSC
Gasification of the production base of “LB Bulgaricum” JSC.
In April 2010 was contracted with “LB Bulgaricum” JSC the gasification of the manufacturing base in the town of Vidin. The installation was designed and built by “Gastec BG” LTD, but due to the lack of appropriate supplier of compressed natural gas has not yet been put into operation.
GAS Installation “Synergon petrloleum” JSC, Sofia
In 2010 GASTEH BG Ltd. organized the delivery and installation of a pumping unit to supply the plant for filling bottles with domestic LPG owned “Synergon petrloleum” JSC, located in Sofia, Kremikovtzi region – industrial zone. Gas installation was designed by the engineer Lyubomir Arsov / arsov@nsc-bg.com /, built and put into operation in January 2010.