Warehouse for LPG Synergon Petroleum – stagе 2
In March 2012, “GASTEH BG” Ltd. was awarded and launched the second phase of expansion of the Warehouse for LPG in Sofia, Kremikovtsi, owned by “SYNERGON Petroleum” Ltd. The extension of the second stage consists in:
- increase the volume of the existing tank farm with the installation of 3 more units tank for LPG with a total capacity of 780 m ³;
- construction of industrial gas installation, achieving a collaborative work of new and existing equipment;
- reconstruction of 4 pieces auto-cast devices for loading tankers of LPG;
- reconstruction of electrically schemes and building emergency signaling system;
Supplied and installed equipment, and constructed industrial gas installation are in accordance with the Directive 97/23/EC, as well as the requirements of the “Regulations for construction, safe operation and technical inspection of gas equipment and installations for liquefied hydrocarbon gases”.
The second phase of expansion of the Warehouse for LPG completed in May 2012 and increase total capacity of tax warehouse with 1,560 m ³. Construction workswere carried outby the company ”Edem D2″ /http://www.edem-d2.com/. Chief designer of the site was Lyubomir Arsov /arsov@nsc-bg.com/ and his skilled team.