Identification plates in accordance with Ordinance No H-18 from December 13th 2006

Inform all current and future partners of our company that we can manufacture, supply and installation of mounting plates and identification plates for tanks according to the “Appendix № 19″ to “Ordinance No H-18 from December 13th 2006 about recording and reporting sales at commercial objects by fiscal devices”. More »

Equipment of methane stations ASPRO ™

From the 2013 GASTEH BG Ltd. has partnered with a company DELTA COMPRESION S.R.L, which are the official representative and offer high-quality technological equipment of methane stations ASPRO ™. More »

Consultation to the Law on Excise Duties and Tax Warehouses

Dear customers, GASTEH BG Ltd. is pleased to provide you the newest and actual service – Consultation and internal control to the Law on Excise Duties and Tax Warehouses / EDTWA /. More »

Warehouse for LPG Synergon Petroleum – stagе 2

In March 2012, “GASTEH BG” Ltd. was awarded and launched the second phase of expansion of the Warehouse for LPG in Sofia, Kremikovtsi, owned by “SYNERGON Petroleum” Ltd. The extension of the second stage consists in: More »

Warehouse for LPG Synergon Petroleum – stagе 1

In November 2011, GASTEH BG Ltd was awarded and launched the first phase of capacity expansion to Warehouse for LPG in Sofia, Kremikovtsi, owned by “SYNERGON PETROLEUM” Ltd. The extension consists in: More »

Unloading point for propane-butane, city of Dobrich – 2

In May 2011 was finished also the second stage, including the finalization of the rail unloading platform, thus increasing its capacity up to servicing 15 rail tankers. A second compressor BLACKMER LB601L with a capacity of 108 m³/h as well as a pump SIHI UEA8006 with a capacity of 60 m³/h were supplied and installed. Furthermore were installed 3 tanks for propane-butane, 260 m³ each. More »

Unloading point for propane-butane, city of Dobrich – 1

In November 2010 started the construction of the first stage of the construction of the most modern unloading point for propane-butane in the country and on the Balkans. It is owned by Toplivo P.L.C. The capacity of the installation is a simultaneous servicing of 8 rail tankers and 2 road transportation tankers. A compressor BLACKMER LB601L with a capacity of 108 m³/h was supplied and installed. More »

 

Tag Archives: reference letter

Reference letter from ELACITE MED

ELACITE MED“ELATSITE MED”AD makes this reference to “GASTEH BG” Ltd. in assurance that the company performed entirely, without any remarks, a reconstruction and alteration of the charging technology of tanks with LPG according to Art. 60 – Ordinance for Device Safe Operation and Technical Supervision of Gas Equipment and Installations for Liquefied Hydrocarbon Gases (ODSOTSGEILHG) at site: mining complex” ELATSITE – MED” AD, warehouse for LPG in a production – repair station, Part : tank section and a place for road tankers .

We are pleased with the quality of construction work, the service and the implementation of the tasks and requirements, set from our side.

Reference letter from ELACITE MED

ELACITE MED“ELATSITE MED” AD makes this reference to “GASTEH BG” Ltd. regarding the implementation of the contract for a subscription technical service and maintenance of:

  •  Industrial gas installation with Reg № SGI 0444;
  •  Industrial gas installation with Reg № SGI 0445;
  •  Industrial gas installation with Reg № SgGI 0316;
  •  Industrial gas installation with Reg № SgGI 0350;
  •  Tank LPG Reg № SgSN 0093;
  •  Tank LPG Reg № SgSN 0082;
  •  Tank LPG Reg № SgSN 0075;
  •  Gas condensing boilers – 6 pcs.;
  •  Ceramic gas emitters – 165 pcs .;
  •  Electric discharger for LPG – 2 pcs.;

Reference letter from GP Group Ltd.

Reference from GP Group Ltd.

“GP Group” Ltd. issued this reference to “GASTEH BG” Ltd. regarding the implementation of the contract: Preparation of tanks for calibration in accordance with the implementation of the requirements of Regulation H-18 to 14 the number of objects – gas stations owned by “Rompetrol BULGARIA”.

“GASTEH BG” Ltd. perform timely and quality under the Treaty using qualified personnel with experience in the industry. The company also observed all rules and regulations for safe working conditions required under current legislation and standards, and strict adherenced PSH each of the sites.