Category Archives: Finished Projects
Reconstruction methane station “METAMODUL” Ltd.
In December 2009, at the existing methane station of “METAMODUL” Ltd address, “Crystal” district, Pernik adjustments were made and a second compressor type “Microbox Gallileo” MXL 185-4-1500-5 has been installed, with power 185 [kW], 4 levels, 1500 rpm and maximum consumption 1350nm ³ / h. Gas station is supplied from Central pipeline working pressure from 0.6 [MPa]. With this reconstruction of the facility, the capacity is increased to 2100 nm ³ / h.
Methane station “M – GAS”, Plovdiv
Methane station “M – GAS”, address: Plovdiv, district “Chaika”, “Saint Petersburg” Blvd.
The methane station was built in 03. 2008, materials and equipment installed:
Gas compressor “SAFE”, model: SW250F6-EM110, electric power 250 kW, capacity 1500 Hm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov