Identification plates in accordance with Ordinance No H-18 from December 13th 2006

Inform all current and future partners of our company that we can manufacture, supply and installation of mounting plates and identification plates for tanks according to the “Appendix № 19″ to “Ordinance No H-18 from December 13th 2006 about recording and reporting sales at commercial objects by fiscal devices”. More »

Equipment of methane stations ASPRO ™

From the 2013 GASTEH BG Ltd. has partnered with a company DELTA COMPRESION S.R.L, which are the official representative and offer high-quality technological equipment of methane stations ASPRO ™. More »

Consultation to the Law on Excise Duties and Tax Warehouses

Dear customers, GASTEH BG Ltd. is pleased to provide you the newest and actual service – Consultation and internal control to the Law on Excise Duties and Tax Warehouses / EDTWA /. More »

Warehouse for LPG Synergon Petroleum – stagе 2

In March 2012, “GASTEH BG” Ltd. was awarded and launched the second phase of expansion of the Warehouse for LPG in Sofia, Kremikovtsi, owned by “SYNERGON Petroleum” Ltd. The extension of the second stage consists in: More »

Warehouse for LPG Synergon Petroleum – stagе 1

In November 2011, GASTEH BG Ltd was awarded and launched the first phase of capacity expansion to Warehouse for LPG in Sofia, Kremikovtsi, owned by “SYNERGON PETROLEUM” Ltd. The extension consists in: More »

Unloading point for propane-butane, city of Dobrich – 2

In May 2011 was finished also the second stage, including the finalization of the rail unloading platform, thus increasing its capacity up to servicing 15 rail tankers. A second compressor BLACKMER LB601L with a capacity of 108 m³/h as well as a pump SIHI UEA8006 with a capacity of 60 m³/h were supplied and installed. Furthermore were installed 3 tanks for propane-butane, 260 m³ each. More »

Unloading point for propane-butane, city of Dobrich – 1

In November 2010 started the construction of the first stage of the construction of the most modern unloading point for propane-butane in the country and on the Balkans. It is owned by Toplivo P.L.C. The capacity of the installation is a simultaneous servicing of 8 rail tankers and 2 road transportation tankers. A compressor BLACKMER LB601L with a capacity of 108 m³/h was supplied and installed. More »

 

Category Archives: 2009 Finished Projects Methane Stations

Methane station “OMV Bulgaria”, Pazardzhik

This slideshow requires JavaScript.


Methane station “OMV Bulgaria”, address: Pazardzhik, Plovdiv road

Methane station was built in 04. 2009, materials and equipment installed:

Gas compressor “NOUVO PIGNONE”, model: BHV, electric power 200 kW, 980 nm3 performance, three-stage, inlet gas 1.2 MPa, 25 MPa output
two double columns Brien model: WAYNE DRESSER

Designer: Eng. Lyubomir Arsov

BOTTLE GROUPS FOR INDUSTRIAL SECTOR

This slideshow requires JavaScript.

Gastec BG “LTD produces bottled groups with different volume from 450 nm3/h to 2400 nm3/h. The groups are manufactured and delivered according to the maximum hourly gas consumption.
The company has a specialized transportation for delivery of the cylinder groups. Bottling groups are branded CE.
nm3 – (normal cubic meter).

Metan station “M-GAS” Ltd., Blagoevgrad

This slideshow requires JavaScript.


Automobile gas-supply station for compressed natural gas of “M-GAS” LTD company, address – Blagoevgrad, “Vasil Levski” str. № 61, has been designed by engineer Lubomir Arsov /arsov@nsc-bg.com/, build and put into operation December 2009 by “Gastec BG” LTD. Materials and equipment installed:
A container with two compressors “SAFE”, type SW-250 T-16-EM, each with a capacity 250 [kW] and a maximum output of 2250nm ³ / h
two columns ESP 22/200 for motor vehicles
one column ESP 22/200/1 charging bottle groups
The supply of gas station is performed via central pipeline with working pressure of 1.6. MPA