Category Archives: 2008 Finished Projects Methane Stations
Methane station “M – GAS”, Plovdiv
Methane station “M – GAS”, address: Plovdiv, district “Chaika”, “Saint Petersburg” Blvd.
The methane station was built in 03. 2008, materials and equipment installed:
Gas compressor “SAFE”, model: SW250F6-EM110, electric power 250 kW, capacity 1500 Hm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
Methane Station “METAMODUL” Ltd., Sofia
Methane Stations “METAMODUL” Ltd., address: Sofia, “Simeonovsko road”
Methane was built in 05. 2008, materials and equipment installed:
- Gas compressor “GALLILEO”, model: MIKROBOX 132 Electric power 110 kW, output 600 Hm3, gas input 0.6 MPa, 25 MPa output
- Two pieces of double columns
Methane station “Bellagio” Ltd., 182 “Europe” Blvd
Methane station “Bellagio” Ltd., address: Sofia, 182 “Europe” Blvd.
Methane was built in 12. 2006, materials and equipment installed:
Gas compressor “BRC”, model: HT 90, electric power 136 kW, Sm3 performance, four-, inlet gas 0.6 MPa, 25 MPa output
two double columns Brien model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov