Category Archives: 2007 Finished Projects Methane Stations
Methane station “BULROMGAZ 2000″ Ltd., Plovdiv
Methane station “BULROMGAZ 2000″ Ltd., address: Plovdiv, Rodopi overpass
Methane was built in 03.2007, the materials and equipment installed are:
Gas compressor “SAFE”, model: SW160F6-EM95, electric power 160kW, capacity of 1000 nm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
Methane station “BULMARKET DM” Ltd., Plovdiv
Methane station “BULMARKET DM” Ltd., address: Plovdiv, “Yagodovo Road” Street
Methane station was built in 03.2007, materials and equipment installed:
Gas compressor “NOUVO PIGNONE”, model: S80-HT, electric power 160 kW, 800 nm3 performance, three-stage, inlet gas 1.1 MPa, 25 MPa output
two pieces of double columns Model: DPG / H
Designer: Eng. Lyubomir Arsov
Methane station “Samel 90″ PLC, Samokov
Methane station “Samel 90″ PLC, address: Samokov, Ring Road
Methane station was built in 01. 2007, it installed:
two pieces of compressors for natural gas “ASPRO”, model: 115-4R, electric power 160 kW, capacity of 800 Hm3, four-, inlet gas 0.5 MPa, 25 MPa output
Two high number of double columns debit model: ESP 22 / 2
four double columns model “ASPRO”
Designer: Eng. Lyubomir Arsov