Category Archives: 2007 Finished Projects Methane Stations
Methane station “Vekta”, Pazardzhik
Methane station “Vekta”, address: Pazardzhik
CNG station was built in 12.2007 to be attached:
Gas compressor “SAFE”, model: SW132T12-EM95, electric power of 132 kW, Capacity 1100 nm3, four-, gas input 1.2 Mpa, 25 Mpa Output
two pieces of double columns Model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
Methane station “Vekta”, Plovdiv
STAGE 1
Methane station “Vekta”, address: Plovdiv, 180 ” Vasil Levski ” Blvd.
Methane station was built in 08. 2000,materials and equipment installed:
Gas compressor “SAFE”, model: SW132F6-EM95, electric power of 132 kW, capacity 770 Hm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double-column model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
STAGE 2
Methane station “Vekta”, address: Plovdiv, 180 ” Vasil Levski ” Blvd.
Methane station was built in 01. 2007, installed:
Gas compressor “SAFE”, model: SW160F6-EM95, electric power 160kW, capacity 1050 Hm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
Methane station “KUMAKS Invest”, Kazanlak
Methane station “KUMAKS Invest”, address: Kazanlak, BUS Station Kazanlak
Methane was built in 05. 2007, materials and equipment installed:
Gas compressor “SAFE”, model: SW160F6-EM95, electric power 160 kW, capacity 1050 nm3, four-, input gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: ESP 22 / 2
Designer: Lyubomir Arsov