Methane station “BULMARKET SOFIA” Ltd.
Methane station “BULMARKET SOFIA” Ltd., address: Sofia, “Nicholas Mushanov” Street
Methane station was built in 09.2006, materials and equipment installed:
Gas compressor “NOUVO PIGNONE”, model: S70-2BVTN / 3 electric power 132kW, performance 580 Sm3 three-stage, input gas 0.6 MPa, output 25 MPa
compressors for natural gas “NOUVO PIGNONE”, model: S80-HT, electric power 160 kW, 800 nm3 performance, three-stage, inlet gas 0.6 MPa, output 25 MPa
two pieces of double columns Model: DPG / H
Designer: Eng. Lyubomir Arsov
Methane station “BULMARKET SOFIA” Ltd., Sofia
Methane station “BULMARKET SOFIA” Ltd., address: Sofia, “K. Preslavsky ” Street
CNG station was built in 11.2006 to be attached:
compressor gas “NOUVO PIGNONE”, Model: S45A, electric power 55 kW, 280 nm3 performance, three-stage, inlet gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: DPG / H
Designer: Lyubomir Arsov
Methane station “M – GAS”, Rousse
Methane station “M – GAS”, address: Rousse, “Lipnik” Blvd.
Methane station was built in 08. 2006, materials and equipment installed:
Gas compressor “SAFE”, model: SW160F6-EM95, electric power 160kW, capacity of 1000 Hm3, four-, input gas 0.6 MPa, 25 MPa output
Three at the number, double of model columns: ESP 22 / 2
Designer: Lyubomir Arsov