Category Archives: 2006 Finished Projects Methane Stations
Methane station “TEMPO – PETROL” PLC, Sofia, distr
Methane station “TEMPO – PETROL” PLC, address: Sofia, district Druzhba 2, “Dimitar Peshev” Str.
Methane station was built in 01.2006, materials and equipment installed:
Natural gas compressor “SAFE”, model: SW90F6-EM95, electric power 90 kW, capacity 590 Hm3, four-, input gas 0.6 MPa, 25 MPa output
a number of dual-column model: ESP 22 / 2
Designer: Eng. Lyubomir Arsov
Methane station “BULMARKET SOFIA” Ltd.
Methane station “BULMARKET SOFIA” Ltd., address: Sofia, “Nicholas Mushanov” Street
Methane station was built in 09.2006, materials and equipment installed:
Gas compressor “NOUVO PIGNONE”, model: S70-2BVTN / 3 electric power 132kW, performance 580 Sm3 three-stage, input gas 0.6 MPa, output 25 MPa
compressors for natural gas “NOUVO PIGNONE”, model: S80-HT, electric power 160 kW, 800 nm3 performance, three-stage, inlet gas 0.6 MPa, output 25 MPa
two pieces of double columns Model: DPG / H
Designer: Eng. Lyubomir Arsov
Methane station “BULMARKET SOFIA” Ltd., Sofia
Methane station “BULMARKET SOFIA” Ltd., address: Sofia, “K. Preslavsky ” Street
CNG station was built in 11.2006 to be attached:
compressor gas “NOUVO PIGNONE”, Model: S45A, electric power 55 kW, 280 nm3 performance, three-stage, inlet gas 0.6 MPa, 25 MPa output
two pieces of double columns Model: DPG / H
Designer: Lyubomir Arsov