Category Archives: 2005 Finished Projects Gas Stations Gas
Gas station “Dragal” Ltd., Dragoman
![]()
Gas station “Dragal” Ltd., address: Dragoman, behind the petrol station “Petrol”
Facility was built in 07.2005, materials and equipment installed:
10 m3 tank, underground installation
Pump unit
column “FAS-220-2″
LPG Unloading area “Butane Gas” Ltd., Pernik
STAGE 2
LPG Unloading area “Butane Gas” Ltd., address: Pernik, the territory of plant “STEEL” AD
Facility was built in 06.2005, equipment installed:
Compressor “CORKEN 490″
Four cast railway equipment
one auto tap
a tank at 103
Designer: Eng. Lyubomir Arsov
STAGE 3
LPG Unloading area “Butane Gas” Ltd., address: Pernik, the territory of plant “STEEL” AD
Facility was built in 08.2007, equipment installed:
Compressor “CORKEN 510″
Six cast railway equipment
one auto tap
two tanks in 1203
Designer: Eng. Lyubomir Arsov
Gas station “Interpetroleum & Partners” Ltd., Kostinbrod
![]()
Gas station “Interpetroleum & Partners” Ltd address: Kostinbrod – the entrance of Sofia (right)
Facility was built in 04. 2005, materials and equipment installed:
25 m3 tank, above ground installation equivalent to an underground “in the coffin”
Pump unit SIHI 3605 / 5
column “FAS-220-2″
Designer: Georgi Pishmanov