<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS &#187; 2012 Finished Industrial Projects</title>
	<atom:link href="http://gasteh.bg/english/gas-gasification/industrial-projects/202-finished-industrial-projects/feed/" rel="self" type="application/rss+xml" />
	<link>http://gasteh.bg/english</link>
	<description>DESIGN, INSTALLATION AND MAINTENANCE OF GAS AND HEATING INSTALLATIONS</description>
	<lastBuildDate>Sat, 01 Feb 2014 16:45:51 +0000</lastBuildDate>
	<language>en-US</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	
	<item>
		<title>Warehouse for LPG Synergon Petroleum &#8211; stagе 2</title>
		<link>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/</link>
		<comments>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/#comments</comments>
		<pubDate>Tue, 10 Apr 2012 16:20:16 +0000</pubDate>
		<dc:creator><![CDATA[Velikden]]></dc:creator>
				<category><![CDATA[2012 Finished Industrial Projects]]></category>
		<category><![CDATA[All Projetcs]]></category>
		<category><![CDATA[Featured]]></category>
		<category><![CDATA[Industrial projects]]></category>
		<category><![CDATA[Directive 97/23/EC]]></category>
		<category><![CDATA[loading tankers of LPG]]></category>
		<category><![CDATA[LPG]]></category>
		<category><![CDATA[Synergon Petroleum]]></category>
		<category><![CDATA[units tank for LPG]]></category>
		<category><![CDATA[Warehouse for LPG]]></category>

		<guid isPermaLink="false">http://gasteh.bg/english/?p=381</guid>
		<description><![CDATA[<p>In March 2012, &#8220;GASTEH BG&#8221; Ltd. was awarded and launched the second phase of expansion of the Warehouse for LPG in Sofia, Kremikovtsi, owned by &#8220;SYNERGON Petroleum&#8221; Ltd. The extension of the second stage consists in: increase the volume of the existing tank farm with the installation of 3 more units tank for LPG with a total</p><p>The post <a rel="nofollow" href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/">Warehouse for LPG Synergon Petroleum &#8211; stagе 2</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></description>
				<content:encoded><![CDATA[<a href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/#gallery-381-1-slideshow">Click to view slideshow.</a>
<p>In March 2012, <strong>&#8220;GASTEH BG&#8221; Ltd.</strong> was awarded and launched the second phase of expansion of the <strong>Warehouse for LPG</strong> in Sofia, Kremikovtsi, owned by &#8220;SYNERGON Petroleum&#8221; Ltd. The extension of the second stage consists in:<span id="more-381"></span></p>
<ul>
<li>increase the volume of the existing tank farm with the installation of 3 more <strong>units tank for LPG</strong> with a total capacity of 780 m ³;</li>
<li>construction of industrial gas installation, achieving a collaborative work of new and existing equipment;</li>
<li>reconstruction of 4 pieces auto-cast devices for <strong>loading tankers of LPG</strong>;</li>
<li>reconstruction of electrically schemes and building emergency signaling system;</li>
</ul>
<p>Supplied and installed equipment, and constructed industrial gas installation are in accordance with the <strong>Directive 97/23/EC</strong>, as well as the requirements of the &#8220;Regulations for construction, safe operation and technical inspection of gas equipment and installations for liquefied hydrocarbon gases&#8221;.</p>
<p>The second phase of expansion of the <strong>Warehouse for LPG</strong> completed in May 2012 and increase total capacity of  tax warehouse with 1,560 m ³. Construction workswere carried outby the company &#8221;Edem D2&#8243; /<a title="Edem D2" href="http://www.edem-d2.com" target="_blank">http://www.edem-d2.com</a>/. Chief designer of the site was Lyubomir Arsov /arsov@nsc-bg.com/ and his skilled team.</p>
<p>The post <a rel="nofollow" href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/">Warehouse for LPG Synergon Petroleum &#8211; stagе 2</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Gasification of glass factory Claire-D Ltd</title>
		<link>http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/</link>
		<comments>http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/#comments</comments>
		<pubDate>Sat, 07 Apr 2012 23:59:25 +0000</pubDate>
		<dc:creator><![CDATA[Velikden]]></dc:creator>
				<category><![CDATA[2012 Finished Industrial Projects]]></category>
		<category><![CDATA[All Projetcs]]></category>
		<category><![CDATA[Industrial projects]]></category>
		<category><![CDATA[Gasification]]></category>

		<guid isPermaLink="false">http://gasteh.bg/english/?p=378</guid>
		<description><![CDATA[<p>In January2012 design team of GASTEH BG Ltd. issued a working project for object: Gas installation of industrial building-glassworkshopof  &#8221;Claire-D&#8221; Ltd., Sofia, Orlandovci, Street First Bulgarian Army № 17. The project was completed and commissioned in the April 2012. Constructed industrial gas installation powered machine laminated glass panelsin the workshop and has built adiversion to theboiler roomof the company. Industrial gas installation has the following parameters: Working pressure industrial gas installation &#8211; 4 [bar];</p><p>The post <a rel="nofollow" href="http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/">Gasification of glass factory Claire-D Ltd</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></description>
				<content:encoded><![CDATA[<a href="http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/#gallery-378-2-slideshow">Click to view slideshow.</a>
<p>In January2012 design team of <strong><a title="GAS, GASIFICATION, HEATING INSTALLATIONS DESIGN, INSTALLATION AND MAINTENANCE OF GAS AND HEATING INSTALLATIONS" href="http://www.gasteh.bg/" target="_blank">GASTEH BG Ltd.</a> </strong>issued a working project for object: Gas installation of industrial building-glassworkshopof  &#8221;Claire-D&#8221; Ltd., Sofia, Orlandovci, Street First Bulgarian Army № 17.<span id="more-378"></span></p>
<p>The project was completed and commissioned in the April 2012. Constructed industrial gas installation powered machine laminated glass panelsin the workshop and has built adiversion to theboiler roomof the company.</p>
<p>Industrial gas installation has the following parameters:</p>
<ul>
<li>Working pressure industrial gas installation &#8211; 4 [bar];</li>
<li>Working pressure industrial gas installation deviation workshop &#8211; 100 [mbar];</li>
<li>Working pressure industrial gas installation deviation boiler room &#8211; 20 [mbar];</li>
</ul>
<p>The post <a rel="nofollow" href="http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/">Gasification of glass factory Claire-D Ltd</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://gasteh.bg/english/gasification-of-glass-factory-claire-d-ltd/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Warehouse for LPG Synergon Petroleum &#8211; stagе 1</title>
		<link>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/</link>
		<comments>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/#comments</comments>
		<pubDate>Mon, 30 Jan 2012 18:22:16 +0000</pubDate>
		<dc:creator><![CDATA[Velikden]]></dc:creator>
				<category><![CDATA[2012 Finished Industrial Projects]]></category>
		<category><![CDATA[All Projetcs]]></category>
		<category><![CDATA[Featured]]></category>
		<category><![CDATA[Industrial projects]]></category>
		<category><![CDATA[LPG]]></category>
		<category><![CDATA[Warehouse for LPG]]></category>

		<guid isPermaLink="false">http://gasteh.bg/english/?p=384</guid>
		<description><![CDATA[<p>In November 2011, GASTEH BG Ltd was awarded and launched the first phase of capacity expansion to Warehouse for LPG in Sofia, Kremikovtsi, owned by &#8220;SYNERGON PETROLEUM&#8221; Ltd. The extension consists in: increase the volume of the existing tank farm, they were mounted 3 pcs. tank for LPG with a total capacity of  780 m ³; construction of the compressor station for LPG and</p><p>The post <a rel="nofollow" href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/">Warehouse for LPG Synergon Petroleum &#8211; stagе 1</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></description>
				<content:encoded><![CDATA[<a href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/#gallery-384-3-slideshow">Click to view slideshow.</a>
<p>In November 2011, <strong><a title="GAS, GASIFICATION, HEATING INSTALLATIONS DESIGN, INSTALLATION AND MAINTENANCE OF GAS AND HEATING INSTALLATIONS" href="http://www.gasteh.bg/" target="_blank">GASTEH BG Ltd</a> </strong>was awarded and launched the first phase of capacity expansion to <strong>Warehouse for LPG</strong> in Sofia, Kremikovtsi, owned by <strong>&#8220;SYNERGON PETROLEUM&#8221; Ltd.</strong> The extension consists in:<span id="more-384"></span></p>
<ul>
<li>increase the volume of the existing tank farm, they were mounted 3 pcs. tank for <strong>LPG</strong> with a total capacity of  780 m ³;</li>
<li>construction of the compressor station for<strong> LPG</strong> and were installed 2 pcs. BLACKMER LB601L compressors with a total capacity of 216 m³ / h and 2 pcs. SIHI pump, model UEA 8006 with a total capacity of 120 m³ / h;</li>
<li>development of electrical panels and control - measuring devices and automation, control and signaling equipment for the equipment;</li>
<li>achieving a collaborative work of new and existing equipment, which includes 18 pcs. rail tankers, 4 pcs. auto-cast equipment and plant for filling bottles with <strong>LPG</strong>.</li>
</ul>
<p>Supplied and installed equipment, and constructed industrial gas installation are in accordance with the Directive 97/23/EC, as well as the requirements of the &#8220;Regulations for construction, safe operation and technical inspection of gas equipment and installations for liquefied hydrocarbon gases&#8221;.</p>
<p>The object is put into operation in January 2012.<br />
Construction works were carried out by the company &#8221;Edem D2&#8243; /http://www.edem-d2.com/. Chief designer of the site was Lyubomir Arsov /arsov@nsc-bg.com/ and his skilled team.</p>
<p>The post <a rel="nofollow" href="http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/">Warehouse for LPG Synergon Petroleum &#8211; stagе 1</a> appeared first on <a rel="nofollow" href="http://gasteh.bg/english">GASTEH - GAS, GASIFICATION, HEATING INSTALLATIONS</a>.</p>]]></content:encoded>
			<wfw:commentRss>http://gasteh.bg/english/warehouse-for-lpg-synergon-petroleum-stage-1/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
